{"id":873,"date":"2026-09-10T23:33:40","date_gmt":"2026-09-10T15:33:40","guid":{"rendered":"https:\/\/pcbaemsodm.com\/?p=873"},"modified":"2026-09-10T23:34:04","modified_gmt":"2026-09-10T15:34:04","slug":"how-long-does-it-take-to-review-an-order","status":"publish","type":"post","link":"https:\/\/pcbaemsodm.com\/ru\/2026\/09\/10\/how-long-does-it-take-to-review-an-order\/","title":{"rendered":"\u0421\u043a\u043e\u043b\u044c\u043a\u043e \u0432\u0440\u0435\u043c\u0435\u043d\u0438 \u0437\u0430\u043d\u0438\u043c\u0430\u0435\u0442 \u043f\u0440\u043e\u0432\u0435\u0440\u043a\u0430 \u0437\u0430\u043a\u0430\u0437\u0430?"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"873\" class=\"elementor elementor-873\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-3bc25c0 e-con e-atomic-element e-flexbox-base e-3bc25c0-113a31a\" data-id=\"3bc25c0\" data-element_type=\"e-flexbox\" data-e-type=\"e-flexbox\" data-interaction-id=\"3bc25c0\">\n    \t\t<div class=\"elementor-element elementor-element-93017ea elementor-widget elementor-widget-text-editor\" data-id=\"93017ea\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p>1. Our engineers are on duty 24\/7 (for PCBs).<\/p><p class=\"otl-paragraph\">For\u00a0<strong>standard FR4\/aluminum\/Rogers PCB<\/strong>\u00a0orders,\u00a0quotes\u00a0will be completed within 10 minutes.<\/p><p class=\"otl-paragraph\">For\u00a0<strong>other special standard PCB\u00a0<\/strong>orders, quotes will be completed within 0.5-3 hours.<\/p><p class=\"otl-paragraph\">For\u00a0<strong>FPC\u00a0<\/strong>orders, quotes will be completed within 0.5-2 hours.<\/p><p class=\"otl-paragraph\">Quotes for\u00a0<strong>Advanced PCB\/Rigid-Flex\u00a0<\/strong>orders will be completed within 4-8 hours during Monday to Saturday, 9 AM to 6 PM GMT+8.<\/p><p class=\"otl-paragraph\">If it&#8217;s urgent, you can contact the sales representative or Livechat online to expedite the review process (No Livechat online duty after 18:00 on Saturday).<\/p><p>2.\u00a0<strong>Assembly<\/strong>\u00a0orders require BOM or related non-Gerber files and will be treated as special cases. Quotes for assembly orders will be completed within 1-2 days (except for some shared project orders, which may have BOM issues that need confirmation with the author, leading to uncertain quotation times).<\/p><p>3.\u00a0<strong>CNC\/3D<\/strong>\u00a0orders will be quoted within 0.5-2 hours during Monday to Saturday, 9 AM to 6 PM, GMT+8. Outside of working hours, the review process will also be completed within 6-12 hours. If it&#8217;s urgent, you can contact the sales representative to expedite the review process.\u00a0\u00a0<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\n<\/div>\n\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>1. Our engineers are on duty 24\/7 (for PCBs). For\u00a0standard FR4\/aluminum\/Rogers PCB\u00a0orders,\u00a0quotes\u00a0will be completed within 10 minutes. For\u00a0other special standard PCB\u00a0orders, quotes will be completed within 0.5-3 hours. For\u00a0FPC\u00a0orders, quotes will be completed within 0.5-2 hours. Quotes for\u00a0Advanced PCB\/Rigid-Flex\u00a0orders will be completed within 4-8 hours during Monday to Saturday, 9 AM to 6 PM GMT+8. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_joinchat":[],"footnotes":""},"categories":[20],"tags":[],"class_list":["post-873","post","type-post","status-publish","format-standard","hentry","category-checking-orders"],"_links":{"self":[{"href":"https:\/\/pcbaemsodm.com\/ru\/wp-json\/wp\/v2\/posts\/873","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pcbaemsodm.com\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pcbaemsodm.com\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pcbaemsodm.com\/ru\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/pcbaemsodm.com\/ru\/wp-json\/wp\/v2\/comments?post=873"}],"version-history":[{"count":4,"href":"https:\/\/pcbaemsodm.com\/ru\/wp-json\/wp\/v2\/posts\/873\/revisions"}],"predecessor-version":[{"id":877,"href":"https:\/\/pcbaemsodm.com\/ru\/wp-json\/wp\/v2\/posts\/873\/revisions\/877"}],"wp:attachment":[{"href":"https:\/\/pcbaemsodm.com\/ru\/wp-json\/wp\/v2\/media?parent=873"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pcbaemsodm.com\/ru\/wp-json\/wp\/v2\/categories?post=873"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pcbaemsodm.com\/ru\/wp-json\/wp\/v2\/tags?post=873"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}